IED Consulting worked on a pre-feasibility study for Arates Hydropower Plant in Armenia.
Services Provided:
- Hydrological assessment/report with average monthly water flows and required ecological (environmental) flows
- General geological assessment and report of the intake site, path of the penstock, and powerhouse site.
- General layout and design of the project.
- Project schedule development
- Pricing of the project, Engineering, Procurement and Construction
- Financial assessment of the project with risk assessment and proposed risk mitigation approach