IED Consulting worked on a pre-feasibility study for Arates Hydropower Plant in Armenia.

Services Provided:

  • Hydrological assessment/report with average monthly water flows and required ecological (environmental) flows
  • General geological assessment and report of the intake site, path of the penstock, and powerhouse site.
  • General layout and design of the project.
  • Project schedule development
  • Pricing of the project, Engineering, Procurement and Construction
  • Financial assessment of the project with risk assessment and proposed risk mitigation approach